This kind of modification let us to "bent the station". The assumptions during planing the station was quite easy. The station should be equiped in two main tracks with a platform for local and cargo trains and a third track for cargo trains only. The third track has been lenghtend to create a small safety track, which is using as (un)loading track also.
  At the station there are also brick station building with a stationmaster room, small waiting room and a small appartment on a second floor. Next to the building there is a brick toilet. Loading road has been built by the track no. 3.
|
|