Home     Worklog     Trackplan     Rolling stock     Gallery     Guestbook     Links

   Over here you can take a look how the station was building. The new descriptions will be added here as soon as some interesting results of work at the station will be noticed. I hope this place will fill many describes soon... :)


29.09.2007
   Od ostatnioego wpisu minęło troche czasu... lato odeszło i nadeszła jesień. Zieleń zaczeła delikatnie nabierać pomarańczowo-brązowych odcieni. Wraz z nią zaszły drobne zmiany w obrębie stacji. Leśniczy zdecydował że należałoby dosadzić klika nowych drzew w okolicy wiaduktu kolejowego. Tak też zrobiłem. W między czasie została rownież wymieniona elektronika przejazdu kolejowego. Teraz pracownicy stacji przygotowują się do elektryfikacji stacji. W najbliższym czasie ma zostać zamontowana sygnalizacja świetlna oraz latarnie na peronach. W końcu będzie można pstrykać fotki w nocy!

30.04.2007
   Last weekend the next meTTing with modules took part. This time in Radom. It was next occasion to connect all our modules into one huge layout and have a great fun! All was working very well. Fortunately the station has survied this parTTy somehow. It hosted many trains consisted of very interesing polish cars/vagons. We were driving, working at the station and having fun together. Łukasz has brought two uniphones such that we had voice connection bewteen our signal boxes. The metting was a motivation for me to correct some things at the modul to be able to present the station as well as possible. And... I did it! The station won the main award in event organized by TTclub.pl. The photo shows how the station looks like rigth now. Yeaah... And the next meTTing will be quite soon... in juni.

13.03 - 14.04.2007
   On the box which I've got back some lines ago.. the modul with railroad crossing has come into existance. The projeck was made recently. The module is 30cm long. It connects the station and the module where right now the semaphore is standing. I've finished it quite fast. I needed about 3 days to make a road, railroad crossing took me next one day, grass and plants it was next two days, and the signalman's building next two... I'd like to add only that this modul is the first one where I used to "electro-grass-plantator" which I'd borrowed from my friend. The finale efect was great! At last I'm satisfied from my grass. At the end of work I've added some signs to mark the begining and the end of the town.
On Monday I've spend about two hours gaping at the modul and playing as a signalman with this... red-white stright something on the crossing... (I don't know its engilsz name.) Open, close, open, close... And again... Here you can take a look how it works(the movie).

8.02.2007
   The time has come to plant some trees. A little bit of wires, "lieves" and... there it is - first tree has taken roots near to the loading place. Moreover I've get back a box from the old modul I'd built some years ago. And it give a chance to create another/new part of local railroad line :]

20.12.2006
   After the meeting in Bytom I can say that the control panel is 100% ready. The only things I have to add are (barriers, DCC, lights controler), which will make control over all things which are moving and lighting much easier. Now I'm just dreaming about device which could be able to "say" that the train is comming (e.g. to the track no. 2) by itself...

1.11.2006
   Repairs. The main building at the station was changed and it get new lighting system in 5 different rooms. To complet this set I just need to make an electronic driver. Moreover the builnig need only some small decorations. Today I've put the finishing touches to two of 9 walls (Painting+weathering). Now I have to make some small parts like the tabels with a station's name, signs and a postbox.

14.10.2006
   The next meeting in Bytom. However it's difficult to noticed a big progress but instead if it hole electronic under the layout is finished and well working. Now I'll make a little lifting of the building at the station...

10-11.06.2006
   The 4th "Workshop" (meeting with modul layouts) has taken part in Bielsko-Biała in second weekend of june. It was next occasion to check out effects of my and my friends efforts. It turned out that results are very positive.

2.06.2006
   The time has come to cobbel a loading place in a realistic way and to level ground on the south part of the station. Oh, and I have to sow a grass there. More photos are in the gallery...

23.05.2006
   Today is a next day of tracks painting. It is not the most spectalucar activity I have ever done, and that is why it takes my so much time... but I hope I will finish it someday...

11.05.2006
   The grass sowwing is in progress. In parts of station where tracks are finished there is more grass, shrubs, bushes and flowers every day. Now I have to "green" only the small part of modul near to the station building, but it can wait...

22.04.2006
   Spotkanie w Bytomiu. Zaprezentowałem pozostałym kolegom sTTandardowiczom obecny stan prac na tym kawałku stacji a przy okazji posadziłem znowu trochę trawy pomiędzy torami...

07.02.2006
   Nadszedł czas na poprawienie toru wjazdowego na stację. Zdjęcie wykonane w chwli gdy ekipa starała się usunąć resztki starego toru i przygotować teren na położenie nowego.

17.12.2005
   Pierwsze fotki na zaszutrowanym kawałku tory. Składzik z osobówkami wtacza się na tor drugi. Powoli widać więc pierwsze zarysy stacji :)


© Grzech Barski 2006